Kipapa Stream Bridge Closed October 6-9 For Rehabilitation Work

5 10 2017

The Hawaii Department of Transportation (HDOT) Highways Division, will be closing Kamehameha Highway continuously in both directions between Ka Uka Boulevard and Lanikuhana Avenue from 9 p.m. on Friday night, Oct. 6, 2017, through 5 a.m. on Monday morning, Oct. 9, 2017, for bridge deck work.

HDOT advises motorists to use the H-2 Freeway as an alternate route and encourages the public to utilize traffic apps to stay informed of congested areas. A full closure is needed to accommodate the heavy equipment to install precast panels and transitions on the mauka ends of the Kipapa Stream (Roosevelt) Bridge.

Electronic message boards have been posted to alert motorists of the closures. Special Duty Police Officers will be on-site to assist with traffic control. Emergency vehicles, first responders, and TheBus have been notified of the roadwork and will be allowed through the closure. Roadwork is weather permitting.

 


Actions

Information

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s




%d bloggers like this: